Question #48346

If a firm were to bid to do a turnkey operation where they would choose a building site designing a cement factory to build the plant hire construction crews assemble materials and equipment to run the new factory and turn over the finished factory ready to operate to the owners the firm would be using which of the following ?


Options:

Answer: If a firm were to bid to do a turnkey operation where they would choose a building site designing a cement factory to build the plant hire construction crews assemble materials and equipment to run the new factory and turn over the finished factory ready to operate to the owners the firm would be using which of the following Systems selling.