As NATO’s structure developed and more space was needed, its Headquarters moved to central Paris in April 1952. At first it was temporarily housed at _________ , but it then moved to a purpose-built edifice at _________ in 1960.
Options:
Answer:
As NATO’s structure developed and more space was needed, its Headquarters moved to central Paris in April 1952. At first it was temporarily housed at Palais de Chaillot, Porte Dauphine , but it then moved to a purpose-built edifice at Palais de Chaillot, Porte Dauphine in 1960.