Question #72520

The standard cost of allocation base, allowed to output achieved, is multiplied to standard variable overhead rate is to calculate __________?


Options:

Answer: The standard cost of allocation base, allowed to output achieved, is multiplied to standard variable overhead rate is to calculate variable manufacturing overhead cost.