How much MW electricity the Engro Powergen Thar Limited’s (EPTL) has started pumping into the national grid on 19 march 2019?
Options:
Answer:
How much MW electricity the Engro Powergen Thar Limited’s (EPTL) has started pumping into the national grid on 19 march 2019 330 MW.