Quiz #85

25

Questions

3

Attempts

0%

Avg. Score

Civil Engineering Quiz - 25 Questions
Quiz Information
  • Questions: 25
  • Time Limit: 25 minutes
  • Pass Percentage: 33%
  • Coins per Question: 1
  • Bonus Coins: 5
  • Negative Marking: No
Sample Questions
  • 1
    The normal annual precipitation at stations X, A, B and C are 700 mm, 1000 mm, 900 mm and 800 mm respectively. If the storm precipitation at three station A, B and C were 100 mm, 90 mm and 80 mm respectively, then the storm precipitation for station X will be___________________?
  • 2
    If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be_____________________?
  • 3
    The area between the isohyets 45 cm and 55 cm is 100 square km and between 55 cm and 65 cm is 150 square km. The average depth of annua! precipitation over the above basin of 250 square km will be__________________?

These are just sample questions. The actual quiz contains 25 questions.

Start Quiz Now

Taking quiz as guest. Login to save your progress and earn coins.

Share This Quiz
Top Performers

No attempts yet. Be the first to set a high score!

AdBlock Detected

We've detected that you're using an ad blocker. Our website is made possible by displaying online advertisements to our visitors.

Please support us by disabling your ad blocker for this website.

How to disable your ad blocker:

  1. Click on the ad blocker icon in your browser's toolbar
  2. Select "Pause on this site" or "Don't run on pages on this domain"
  3. Refresh the page