Question #42965

When high flood passing down weir creating high up lift pressures and there is no flow in the canals, if such condition is taken for design and is called__________________?


Options:

Answer: When high flood passing down weir creating high up lift pressures and there is no flow in the canals, if such condition is taken for design and is called Worst condition.