To avoid vaporisation in the pipe line, the pipe line over the ridge is laid such that it is not more than_______________?
Options:
Answer:
To avoid vaporisation in the pipe line, the pipe line over the ridge is laid such that it is not more than 6.4 m above the hydraulic gradient.