The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about _________________ mm of water column per metre height of packing?
Options:
Answer:
The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about 20-40 mm of water column per metre height of packing.