If the weir flood is designed continuous with divide piers as reinforced structure,such that the weight of divide piers, keep the structure safe against uplift, is called__________________?
2
The rise in river water level at up stream due to construction of weir is called__________________?
3
Silt free water should be supplied to the canals through______________________?
These are just sample questions. The actual quiz contains 20 questions.